搜索历史清除全部记录
最多显示8条历史搜索记录噢~
All
- All
- Product Management
- News and Information
- Introduction Content
- Corporate outlets
- Frequently Asked Questions
- Corporate Video
- Corporate Portfolio
Project Performance
Changcheng New Energy Co., Ltd. Malaysia Phase I Project
Location: Johor Industrial Park, Johor Bahru, State of Johor, Malaysia. Main Process Unit I (20,000 t/a solketal, 15,000 t/a diacetone alcohol, 30,000 t/a sodium methoxide); utility building (housing compressed air, nitrogen generation, purified water and refrigeration); tank farm; Class E warehouse; steam boiler house; maintenance workshop; circulating water and pump house; fire water station; administration building; gatehouse; high-voltage distribution room; substation and distribution room; central control and laboratory building; cabinet room; and outdoor works. The substation and the cabinet room are located within the utility building.