搜索历史清除全部记录
最多显示8条历史搜索记录噢~
All
  • All
  • Product Management
  • News and Information
  • Introduction Content
  • Corporate outlets
  • Frequently Asked Questions
  • Corporate Video
  • Corporate Portfolio

Changcheng New Energy Co., Ltd. Malaysia Phase I Project


Location: Johor Industrial Park, Johor Bahru, State of Johor, Malaysia. Main Process Unit I (20,000 t/a solketal, 15,000 t/a diacetone alcohol, 30,000 t/a sodium methoxide); utility building (housing compressed air, nitrogen generation, purified water and refrigeration); tank farm; Class E warehouse; steam boiler house; maintenance workshop; circulating water and pump house; fire water station; administration building; gatehouse; high-voltage distribution room; substation and distribution room; central control and laboratory building; cabinet room; and outdoor works. The substation and the cabinet room are located within the utility building.